New buildings in Dvorec production area

During the first half of 2021 we have built two new buildings. Once again we used prefabricated components for the construction.

The first bulding is the production hall D7 (area: 2500 m2), where a new palette line will be situated in 2022. The second building is the U hall (area: 625 m2) for our maintenance department. You can watch the building process through the following photo gallery.


Photo credit: Dušan Skala

Neustále pracujeme na zlepšení webové prezentace a proto by nás zajímala odpověď na následující otázku:

Jste firemní zákazník? ANO NE
Děkujeme!